Industrial Metal Roof Replacement for a New Tenant - Case Study

Project

Industrial Metal Roof Replacement for a New Tenant

Brief

The owner of a large industrial building needed its old cement-sheet roof replaced with an insulated metal roof before a new tenant moved in, on a fixed deadline and to the tenant's performance requirements.

Solution

The building and the deadline

The owner of a large industrial building had a new tenant lined up, and the lease depended on the roof. The existing cement-sheet roof had reached the end of its life. The incoming tenant wanted a roof that would stay watertight for the long term, insulate the building properly and comply with current regulations, and the work had to be finished before the tenancy began.

Scope of work

TCR delivered the roof as a single package, from design to handover:

  • Strip-out: the old roof sheets were removed in full and taken off site.
  • Design and specification: the replacement roof system was designed around the building’s spans, loads and energy targets.
  • Materials and labor: TCR supplied all roofing materials and labor directly, so ordering, deliveries and crews were coordinated by one team.
  • Project management: TCR’s own managers ran the site, from safety to scheduling specialist subcontractors, against the fixed completion date.

The new roof system

The new roof is an insulated profiled-metal system with a clean, modern finish. It was chosen for long-term weather resistance, for its thermal and acoustic performance, and because it can carry rooftop solar panels later without rebuilding the roof. The new roof bays include rows of skylights that bring daylight into the building below. The photographs show the roof part-way through, with new bays on either side of an original bay still waiting to be stripped.

See metal roof replacement and solar-ready roof systems for how this type of work is planned.

Inspections and handover

The work was inspected at each stage as the roof progressed. At completion, the owner received a certificate of compliance for the finished roof, ready to pass to the new tenant.

Outcome

  • The old roof was removed in full and replaced with a new insulated metal roof.
  • The project was delivered on time and within budget, ready for the new tenancy.
  • The building now has a more energy-efficient roof that is ready for solar panels.

UK refurbishment experience, a Texas office

Refurbishment specialists

Our business grew through roof and cladding refurbishment in the UK. That experience shapes the work we now offer from our Texas office.

Repair what can be retained

We investigate the roof problem and explain what can be repaired, restored or replaced, so you can decide how to invest in the building.

Roofing and cladding together

We can coordinate roof, insulation, wall panel and drainage work, including the connections where separate repairs can leave problems behind.

A plan for your working building

We agree access, work areas and protection with your site team, including any restrictions needed while the roof is opened.

Roofing and cladding systems

Roofing systems and materials for Texas facilities

Rustoleum Logo
Sika Logo
Kingspan Logo
Morin Logo
American WeatherStar Logo
GAF Logo
TAMKO Logo
PAC-CLAD Logo
1

Tell us about the building

Start with the address and the roof or cladding problem. Photographs are helpful if you already have them.

2

Arrange a site visit

We review the affected areas and discuss how you use the building and what you want the work to achieve.

3

Review the quotation

Your quotation explains the proposed repairs or refurbishment, the areas included and the price.

4

Agree the work plan

We discuss timing, access, deliveries and protection with your site contact before work begins.

5

Complete the work

We carry out the agreed work and discuss any changes needed if opening the roof reveals additional damage.

6

Handover

We review the completed work and provide the care information and documents included in your project.