Commercial Metal Roof Retrofit in San Antonio and Austin

A new metal roof built over your old one, without a tear-off

Metal roof-over and recover

Metal roof retrofit for San Antonio and Austin buildings

We install commercial metal roof retrofit systems in San Antonio and Austin: a new metal roof built over the existing one, on new sub-framing, without tearing the old roof off. Buyers call it a roof-over, a recover or a retrofit roof system. It is our first recommendation for a metal building or low-slope warehouse when the structure is sound and the old roof has simply worn out.

The old roof stays in place as a working lid while the new one goes on above it. New sub-purlins or slope framing carry the new panels down into the building’s own purlins and frames, and the space between the two roofs takes new insulation. You get a new weather surface, a better-insulated roof and far less disruption below than a tear-off causes. We bring 20+ years of commercial roofing experience to that call, and we tell you plainly when a retrofit is the wrong one.

Our office is in Bulverde, a typical drive of about 30 minutes to central San Antonio and about an hour and 20 minutes to central Austin. Read how we approach metal roof retrofit in San Antonio and metal roof retrofit in Austin, or start from our overviews of commercial roofing in San Antonio and commercial roofing in Austin.

Industrial unit with a new metal roof installed above its retained roof
Metal roof-over on an occupied industrial unit.

Metal-over-metal retrofit on an existing panel roof

On a metal building, we fasten new sub-purlins across the existing panels and through them into the original purlins. Notched sub-purlins, such as Roof Hugger zees, are cut to sit over the ribs of the existing profile, so they bear evenly and hold the new roof in line. Where the profile or the cavity depth calls for it, we use zee or hat framing on spacers instead. Either way, the new roof hangs on the building’s structure, never on the worn panels.

The existing profile drives the framing choice. Rib height, rib spacing, panel laps and purlin lines decide which sub-purlin fits and where each one lands. We measure them on the roof and check them against any drawings before we order a single length of framing. A sub-purlin that does not match the old profile rocks, overloads its fasteners and shows through the new roof.

The new roof is a complete system in its own right: panels, fasteners, closures and the ridge, eave and rake trims. We install new panels from MBCI or Morin, both manufacturers we are certified to install, or our own specification R-panel systems. The exposed-fastener option is covered in detail on our R-panel roofing and wall cladding page.

A pitched metal roof over a flat or low-slope roof

Many warehouses, retail buildings and offices in San Antonio and Austin sit under a low-slope roof that ponds water, leaks at the seams and has lost most of its insulation value. A framed retrofit fixes the shape as well as the surface. We build light-gauge slope framing over the existing roof, bear it on the structure below and install a pitched metal roof that sheds water to new gutters. The old EPDM or built-up roof stays in place underneath.

Slope framing needs real load paths. We locate the joists, beams or bar joists below and anchor the framing to them, not to the deck alone. Building width, parapets, roof levels and rooftop units set the frame heights and the direction of fall, so we lay all of that out from a measured survey.

A framed metal retrofit is not always the right answer for a flat roof. When the deck is sound, parapets run all the way around and you want to keep the low profile, a TPO recover or TPO roof replacement is often the simpler and better choice. Where both routes are realistic, we price both and tell you which one we would pick for your building.

Sub-framing, connections and the existing structure

The sub-framing carries the new roof’s weight and its wind uplift into the building. We design its depth, spacing and fasteners for the new panels, the insulation and the wind exposure of the site. Where the project needs it, we bring in a structural review of the existing purlins and frames before we commit to an attachment layout.

Drawings help, but the roof itself has the final word. We check purlin condition, flange sizes, earlier alterations and corrosion at the connections. Central Texas metal buildings commonly show rust at laps and fastener holes long before the purlins themselves suffer, and we confirm which of the two we are looking at.

If purlins are badly corroded or the structure has been altered without a record, the scope changes. That means local strengthening, replacing members, or a recommendation to replace the roof instead of recovering it. We tell you before you sign, and the proposal states exactly what structural work is included.

What a metal roof retrofit includes

Measured roof survey

We measure the roof, record the existing profile and purlin lines, inspect the structure from inside and note every opening. That survey sets the framing design, panel lengths and details before anything is ordered.

Sub-framing and new panels

Sub-purlins or slope framing, new metal panels, fasteners, closures and trims, specified as one system. The framing is designed for the panels above it and the structure below it, so every connection has a clear load path.

Insulation in the new cavity

The gap between the old and new roof takes new insulation. We size the cavity for what the building needs and keep the layer continuous at purlins, eaves and ridges, with air and vapor control set for its use.

Gutters, edges and openings

New gutters and downspouts set to the new eave, curbs raised for rooftop units, and skylights and vents flashed into the new panels. Roof-to-wall junctions and changes in level are detailed as part of the roof.

Use the roof cavity for a real insulation upgrade

A retrofit is the most practical moment you will get to add serious insulation to a metal building. The new framing creates a cavity above the old roof, and we set its depth to suit the insulation the building needs. For an under-insulated warehouse, or a workshop that is now air-conditioned, that upgrade is often the biggest gain of the whole project.

Insulation only performs when it is continuous. Gaps at purlins, compressed blankets and open edges at the eave let heat through and let humid air reach cold metal. We detail the insulation layer as carefully as the weather surface, and we place the air and vapor control where the building’s humidity and use require it.

Tell us about air-conditioned areas, moisture-sensitive stock and any condensation dripping from the existing roof. Those facts set the build-up. Where the building needs a factory-made insulated enclosure instead, we compare the retrofit with insulated metal panels on their build-ups and details, not on promised savings.

Drainage, roof edges and rooftop equipment

Raising the roof moves the eave line, so the gutters and downspouts move too. Central Texas rain arrives hard and fast, so we size and set the new gutters for the new roof and the area each one drains, rather than refitting old gutters at the wrong height.

Rooftop units, vents, pipes and skylights all pass through the new roof. We extend curbs to the new roof level, flash them into the new panels and agree with you which equipment stays, moves or is replaced. Penetrations are where retrofit roofs succeed or fail, so we detail each one individually.

Roof-to-wall junctions get the same care. If the walls are tired as well, we renew the cladding in the same project with R-panel or insulated wall panels and set out the eave detail once. That keeps the eave from becoming somebody else’s problem after the roof panels are ordered.

Installation around an occupied building

The biggest practical advantage of a retrofit is that the old roof stays on. Your building stays dry and closed while we work above it, so warehouses, production floors and offices keep running. We still plan the job properly: crane and lift positions, delivery times, material storage, exclusion zones and routes around loading docks are agreed with your site team before we start.

We sequence the roof by area, close each section at the end of the day and protect the space below wherever we open the old roof for curbs, skylights or drainage. Tell us about shift patterns, deliveries and equipment that must keep running, and we build the schedule around them.

Our roof-over case study on an occupied industrial unit, from our UK work, shows the access planning and sequencing a live building needs.

Retrofit, replacement or coating: how we decide

We recommend a retrofit when the structure is sound, the old roof can stay as a lid and the building needs better insulation or a new roof shape. We recommend replacing the panels when the old roof is wet, badly perforated or hiding structural damage that has to be exposed. We recommend a protective metal roof coating when the metal is still sound and the problem is the finish, rust at laps and cut edges, or tired fasteners.

We never cover wet insulation or rotten decking and walk away. If we find it, we remove it or change the recommendation. That is the main reason we survey before we price.

A retrofit price depends on the roof area and shape, the framing type, the panel, the insulation, the edge and gutter work, rooftop equipment and access. Send us the address, any roof plans, photographs and how the building is used, and we will come back with a clear scope. Use our project inquiry form or call (210) 775-0995.

Talk to our team

Request a metal roof retrofit quote in San Antonio or Austin

Tell us about your building, the existing roof and what the new one has to do. Call (210) 775-0995 or use the project inquiry form to arrange a roof survey.

Discuss your metal roof retrofit

Frequently asked questions

Commercial Metal Roof Retrofit in San Antonio and Austin FAQs

What is a commercial metal roof retrofit, and how does it work?

It is a new metal roof installed over the existing roof on new sub-purlins or slope framing, without tearing the old roof off. The framing carries the new roof into the building's structure, and the cavity between the two roofs takes new insulation. It suits metal buildings and many low-slope commercial roofs.

Are you commercial metal roofers near me in San Antonio or Austin?

Yes. We work on commercial and industrial buildings in San Antonio and Austin from our office in Bulverde, just north of San Antonio. That includes warehouses up I-35 toward New Braunfels and flex buildings around Round Rock, as well as both city centers.

Can you put a new metal roof over an existing metal roof?

Yes, when the purlins and frames are sound. We fasten notched sub-purlins or zee framing over the old panels into the existing purlins, then install the new roof on that framing. Before we recommend it, we check the structure and the old roof for wet insulation and heavy corrosion.

Can you build a metal roof over a flat roof?

Yes. We build slope framing over the existing low-slope roof, bear it on the structure below and install a pitched metal roof that drains to new gutters. Where the deck is sound and you want to keep a low profile, a TPO recover can be the better answer, and we will say which we recommend.

What does Roof Hugger framing do?

Roof Hugger makes notched sub-purlins cut to fit over the ribs of a specific existing panel profile. They sit tight on the old roof, fasten through into the original purlins and give the new roof a straight, even base. We match the notch to the profile we measure on your roof.

Can we add insulation during a roof-over?

Yes, and it is one of the main reasons to choose a retrofit. The new framing creates a cavity above the old roof. We size it for the insulation the building needs, keep the layer continuous and place the air and vapor control to suit how the building is used.

Can our business stay open while you retrofit the roof?

In most cases, yes. The old roof stays on and keeps the building dry while we work above it. We agree lift positions, deliveries, storage and exclusion zones with your site team, and protect the space below wherever we open the old roof for curbs or drainage.

Is there a metal roof retrofit contractor near me in Austin?

We cover Austin and its suburbs from our Bulverde office, including manufacturing and flex buildings around Pflugerville and distribution space along SH 130. We survey every roof in person before we price a retrofit, so the proposal is based on the building itself.

When should we replace the roof instead of retrofitting it?

Replace it when the old roof is wet, badly perforated or hiding structural damage that has to be exposed, or when the purlins cannot carry the added framing. A retrofit should never trap wet insulation or rotten decking. Our survey tells you which route fits your building.

What should we send for a retrofit quote?

Send the property address, roof photographs, any roof plans or building drawings, how the building is used and your timetable. Tell us about access limits, operating hours and known problems such as leaks or condensation. You can reach us on (210) 775-0995 or through the contact form.

UK refurbishment experience, a Texas office

Metal roof retrofit

A new metal roof above a suitable existing covering, with subframing, insulation and details considered together.

TPO roofing

New TPO roof systems, TPO roof replacement and TPO recover for warehouses, retail, offices and industrial buildings.

R-panel and insulated panels

R-panel roofing and wall cladding, and insulated metal panels for roofs and walls on new builds and refurbishments.

Protective metal coatings

Preparation, rust and cut-edge treatment, and compatible protective finishes for metal roofs and cladding.

Roofing and cladding systems

Roofing systems and materials for Texas facilities

Rustoleum Logo
Sika Logo
Kingspan Logo
Morin Logo
American WeatherStar Logo
GAF Logo
TAMKO Logo
PAC-CLAD Logo
1

Tell us about the building

Start with the address and the roof or cladding problem. Photographs are helpful if you already have them.

2

Arrange a site visit

We review the affected areas and discuss how you use the building and what you want the work to achieve.

3

Review the quotation

Your quotation explains the proposed metal roof or cladding work, the areas included and the price.

4

Agree the work plan

We discuss timing, access, deliveries and protection with your site contact before work begins.

5

Complete the work

We carry out the agreed work and discuss any changes needed if opening the roof reveals additional damage.

6

Handover

We review the completed work and provide the care information and documents included in your project.