Commercial Roof Surveys in San Antonio and Austin

The survey that comes before a retrofit, TPO, R-panel, insulated panel or coating decision.

Pre-project roof survey

Know the roof before you choose the project

Our commercial roof survey answers one question before you spend money on a roof: which project fits it. Total Cladding and Roofing surveys metal and low-slope roofs on commercial and industrial buildings in San Antonio and Austin, then recommends one of five routes: a metal roof retrofit over the old roof, a TPO roof or TPO recover, new R-panel roofing and wall cladding, insulated metal panels, or a protective coating. You get the findings in plain terms, with photographs and a clear recommendation.

From our Bulverde office we survey buildings for commercial roofing in San Antonio and commercial roofing in Austin, from distribution warehouses along I-35 and I-10 to manufacturing, flex, retail and office buildings. The survey is for owners, facility managers and general contractors planning roof or wall work, not a leak call-out. Tell us which options you are weighing up and we scope the survey to answer that.

Request a roof survey or call (210) 775-0995.

roof inspection drone survey

Start with what happens inside the building

Leak locations, dates and photographs connect the condition inside to the roof above. Water can travel along a deck or a purlin before it drips, so a stained ceiling is a starting point rather than proof of where water gets in. Notes on whether leaks follow heavy rain, wind from one direction or cold mornings help separate roof leaks from condensation and wall leaks. They point to different projects: condensation under a bare metal roof is an insulation problem that a retrofit or insulated panels solve, not a sealant one.

What the survey covers

We agree the scope before the visit. A typical survey covers four areas.

Roof surfaces

Panels or membrane across each roof area, with damage, corrosion, wear, previous repairs and differences between construction phases recorded.

Openings, flashings and edges

Curbs, pipes, skylights, walls, parapets, ridges and eaves, where a small defect lets water into a large area.

Drainage

Gutters, drains, scuppers and downspouts, with evidence of blockage, overflow or standing water.

Inside the building

Leak stains, wet insulation, rust on purlins and deck, and condensation, related back to the roof layout above. Purlin condition decides whether retrofit sub-purlins can fasten through to the existing frame.

Choosing the survey method

A walk-over survey answers most questions. We add other methods only when an open question would change the recommendation.

  • Drone photography gives a full plan view of large or hard-to-reach roofs and a dated record of their condition, which then becomes the base plan for the project layout.
  • Infrared moisture scans show wet insulation under low-slope roofs, because wet areas hold heat after sunset. They are carried out in the evening after a sunny day, and they decide whether a TPO recover can go over the old roof or the wet areas must come out first.
  • Core samples and inspection cuts confirm the layers, insulation and moisture at chosen points, and each cut is patched once the sample is taken.
  • Adhesion test patches show whether a proposed coating will bond to the existing roof.
  • Fastener pull-out tests on the existing deck show whether a TPO recover can be mechanically attached to it as it stands.

When a roof survey is worth doing

A roof that leaks in several places

and has had more patches than it can take, so the choice is between a coating, a recover and a retrofit.

Rust at laps, fasteners and cut edges

on a metal roof, when you need to know whether a coating will still hold or the roof needs a retrofit.

Before a change of use,

such as turning a dry warehouse into conditioned space, when the roof and walls need far more insulation than they have.

Before budgeting

for a retrofit, recover, re-roof or coating over the next few years.

How the survey is carried out

  1. Agree the question and the scope, including access, safety arrangements and anything that needs testing.
  2. Review records: drawings, previous reports, repair history and photos of leaks.
  3. Inspect inside, at leak locations and wherever the roof structure can be seen.
  4. Inspect the roof, area by area, with photographs and notes tied to a roof plan.
  5. Test where needed, using the methods agreed for the scope.
  6. Report and recommend, with the project that fits each roof area and the reasons for it.

What you receive

The findings are set out so they can be acted on and shared with others involved in the building:

  • a roof plan marking each defect and test location;
  • dated photographs of each finding;
  • the recommended project for each roof area: retrofit, TPO, R-panel, insulated panels or coating;
  • the reasons for each recommendation, and the options we ruled out;
  • areas that could not be inspected, and why.

A dry ceiling on the day of the visit does not prove every roof layer is sound, so the report states what was and was not checked.

Metal roofs and low-slope roofs

On metal roofs, the survey concentrates on fasteners and washers, side and end laps, cut-edge corrosion, panel damage, ridge and eave closures, gutters, and rust on purlins seen from inside. These decide whether a roof is a candidate for metal roof restoration with a coating, or has gone past that point and needs a retrofit over it or new R-panel.

On low-slope roofs, it concentrates on seams, flashings at curbs and parapets, blisters and splits, edge metal, drainage and standing water, and the moisture of the insulation below. These decide whether a TPO recover can go over the existing roof, whether the old roof has to come off first, or whether a framed metal retrofit over it is the better answer.

Hail, heat and UV in San Antonio and Austin

Spring hail around San Antonio and Austin dents and splits metal panels, cracks skylights and crushes insulation under membranes, often without an immediate leak. Long summers of heat and UV chalk the paint on metal roofs, fatigue fasteners and sealants, and age TPO and older membranes. The survey records that wear because it decides the project: a dented but sound metal roof can still be coated, while split panels, crushed insulation and rust that has joined up across the roof point to a retrofit or recover.

Access, safety and the occupied building

Roof height, locked access points, fragile surfaces and site rules affect what can be inspected. Old skylights and translucent panels are a fall hazard and are never walked on; they are treated as openings, with protection where work is close to them. Tell us about sensitive operations, restricted rooms and security procedures, and any area we cannot reach is recorded as not inspected rather than assumed to be sound.

Surveys for capital planning

For a capital plan, the survey can cover several roofs or buildings on one site and set out which project each needs and in what order. Share the budget deadline and the records you have. A condition survey is a different level of work from a measured project specification, and we say which one the decision needs.

When to survey a commercial roof

The best time is a year or two before you expect to spend money on the roof, while you still have a choice. A metal roof surveyed while the rust is still on the surface can often be coated; the same roof surveyed after rust has holed the laps needs a retrofit. A low-slope roof surveyed before its insulation gets wet can often take a TPO recover instead of a full tear-off.

Keep the survey report with the building drawings. It becomes the starting point for the project scope, so the specification is built on measured facts.

From survey to the right project

When a roof needs work, the recommendation is one of five projects. A metal roof with surface rust and sound panels takes a protective coating. A metal roof past coating gets a retrofit on sub-purlins over the old one, often with an insulation upgrade. A low-slope roof with a dry, sound deck takes a TPO recover or replacement. A metal building that needs a new skin gets R-panel roofs and walls, and one that needs real insulation value gets insulated metal panels. The report explains which fits each roof area and why, and we do not recommend more work than the findings support.

What affects the survey cost

Roof size, the number of roof areas, height and access, the testing needed and the reporting required all affect the price. A walk-over of one metal roof is a smaller job than a multi-building survey with moisture scans and core cuts. We confirm the scope and fee before the visit.

Before a coating project,

to check the roof is sound enough to take one.

Before re-cladding the walls,

so new R-panel or insulated panels on the walls are planned with the roof.

Talk to our team

Request a commercial roof survey

Contact TCR with the address and the project you are considering. Photos, plans and repair records help if you have them, but a clear description of the building and the roof is enough to start. Our Bulverde office is a typical 30-minute drive from central San Antonio and about an hour and 20 minutes from central Austin.

Request a Roof Survey

Frequently asked questions

Commercial Roof Inspections FAQs

How is a pre-project roof survey different from a commercial roof inspection?

A general commercial roof inspection looks for defects to fix. Our survey asks a different question: which project fits the roof. It records the same condition evidence, then recommends a metal roof retrofit, a TPO roof or recover, R-panel, insulated metal panels or a protective coating, with the reasons for that choice.

Can a visual inspection find every roof problem?

No. It cannot confirm every concealed layer or inaccessible detail. Findings identify where further investigation may be needed.

Do I need to know the roof material first?

No. Existing records help, but identifying the roof can form part of the review.

Does a dry ceiling mean the roof is sound?

No. Leakage can be intermittent and moisture can remain within a roof without visible dripping on the inspection day.

When is moisture testing useful?

When wet insulation could change the recommendation. Under a low-slope roof it decides whether a TPO recover can go over the existing roof or the wet areas have to come out first. The method needs to suit the assembly.

Which buildings and areas do you survey?

Commercial and industrial buildings in San Antonio and Austin and the towns around them, from warehouses and distribution buildings to manufacturing, flex, retail and office space. We are based in Bulverde, typically about 30 minutes by road from central San Antonio and an hour and 20 minutes from central Austin.

Is a drone survey enough?

Sometimes for a visible overview, but it cannot confirm all seams, connections or concealed materials. Closer access may still be needed.

What happens after the survey?

You receive a roof plan, dated photographs and the recommended project for each roof area, with the options we ruled out. If you want to go ahead, we price that project, whether it is a retrofit, a TPO roof, R-panel, insulated panels or a coating.

What affects the inspection cost?

Area, access, complexity, number of buildings and the investigation and reporting required affect the price.

What should I send before the visit?

The address, the project you are considering, any leak locations, and existing reports or drawings. Tell us about restricted access or sensitive operations.

UK refurbishment experience, a Texas office

Refurbishment specialists

Our business grew through roof and cladding refurbishment in the UK. That experience shapes the work we now offer from our Texas office.

Repair what can be retained

We investigate the roof problem and explain what can be repaired, restored or replaced, so you can decide how to invest in the building.

Roofing and cladding together

We can coordinate roof, insulation, wall panel and drainage work, including the connections where separate repairs can leave problems behind.

A plan for your working building

We agree access, work areas and protection with your site team, including any restrictions needed while the roof is opened.

Roofing and cladding systems

Roofing systems and materials for Texas facilities

Rustoleum Logo
Sika Logo
Kingspan Logo
Morin Logo
American WeatherStar Logo
GAF Logo
TAMKO Logo
PAC-CLAD Logo
1

Tell us about the building

Start with the address and the roof or cladding problem. Photographs are helpful if you already have them.

2

Arrange a site visit

We review the affected areas and discuss how you use the building and what you want the work to achieve.

3

Review the quotation

Your quotation explains the proposed repairs or refurbishment, the areas included and the price.

4

Agree the work plan

We discuss timing, access, deliveries and protection with your site contact before work begins.

5

Complete the work

We carry out the agreed work and discuss any changes needed if opening the roof reveals additional damage.

6

Handover

We review the completed work and provide the care information and documents included in your project.