Health & Safety Management

Home » Health & Safety Management

Health & Safety Management

Planning roofing work around people and operations

Roofing work can affect the people below as well as the crew on the roof. Access equipment, falling materials, open roof areas and deliveries all need to be considered before work starts. Tell Total Cladding and Roofing about occupied areas, restricted access and any activities that cannot be interrupted.

Keeping work areas separate from building users

A loading dock, public entrance or pedestrian route may sit directly below the proposed work. The project plan needs to establish where materials will be lifted, where work areas will be restricted and how people will reach the building. If a route must close temporarily, that needs to be agreed with the site contact.

Roof access and concealed hazards

Fragile rooflights, damaged decking and unsecured openings can make a roof unsafe to walk on. Suspected structural damage or hazardous materials may require specialist assessment before roofing work proceeds. A photograph or drone survey does not establish that a roof is safe for access.

What the site team needs to know

Let us know about fire procedures, security checks, sensitive equipment and roof-mounted services. The planned roofing method determines whether work could create noise, dust, odors or an interruption below. Requirements for training evidence, insurance and project safety documents can be included in the tender or discussed before mobilization.

Discuss access before the project starts

Contact TCR with the property address and proposed work. A clear site contact and early discussion of access restrictions help establish a workable roofing plan. Current company information is available through our qualifications and memberships page.

To upload drawings, specs and plans please go to the form on our contact page.

Get in Touch
UK refurbishment experience, a Texas office

Refurbishment specialists

Our business grew through roof and cladding refurbishment in the UK. That experience shapes the work we now offer from our Texas office.

Repair what can be retained

We investigate the roof problem and explain what can be repaired, restored or replaced, so you can decide how to invest in the building.

Roofing and cladding together

We can coordinate roof, insulation, wall panel and drainage work, including the connections where separate repairs can leave problems behind.

A plan for your working building

We agree access, work areas and protection with your site team, including any restrictions needed while the roof is opened.

Roofing and cladding systems

Roofing systems and materials for Texas facilities

Rustoleum Logo
Sika Logo
Kingspan Logo
Morin Logo
American WeatherStar Logo
GAF Logo
TAMKO Logo
PAC-CLAD Logo
1

Tell us about the building

Start with the address and the roof or cladding problem. Photographs are helpful if you already have them.

2

Arrange a site visit

We review the affected areas and discuss how you use the building and what you want the work to achieve.

3

Review the quotation

Your quotation explains the proposed repairs or refurbishment, the areas included and the price.

4

Agree the work plan

We discuss timing, access, deliveries and protection with your site contact before work begins.

5

Complete the work

We carry out the agreed work and discuss any changes needed if opening the roof reveals additional damage.

6

Handover

We review the completed work and provide the care information and documents included in your project.