GREA-3P-24-6xE — Gravel-roof reinforced restoration system

From the Total Cladding and Roofing Technical Library

Log in to edit
First page of Western Colloid GREA-3P-24-6xE system specification

GREA-3P-24-6xE — Gravel-roof reinforced restoration system

Manufacturer
Western Colloid
Product
GREA-3P-24-6xE — Gravel-roof reinforced restoration system
Status
Current
Market
United States
Latest revision
Not confirmed
Latest file date
Not confirmed
Last verified
September 20, 2026
Archived files
0

System overview

Western Colloid specification GREA-3P-24-6xE is a recover gravel / rough surface 2 ply polyester reinforced membrane & 1 ply polyester / acrylic reinforced surface. The official assembly specification identifies its substrate scope, reinforcement, component sequence and installed application quantities.

  • System code: GREA-3P-24-6xE
  • Assembly classification: RECOVER GRAVEL / ROUGH SURFACE 2 PLY POLYESTER REINFORCED MEMBRANE & 1 PLY POLYESTER / ACRYLIC REINFORCED SURFACE
  • Published thickness statement: Total System Dry Mils (approximate) - (fill not included) 165 mils
  • Matched technical set: one complete system specification plus 5 current component bulletins

Manufacturer-defined use

This specified assembly is a cold process method to upgrade existing gravel roofing. The system is water based and environmentally friendly. It has very low odor. It is reinforced with tough, light weight polyester fabrics and fiber glass strands.

Assembly and components

The specification schedules the assembly as follows: No. Component Amount Dry Weight Lb.** 1 Fill coat #298 Emulsion ( as needed 10-12 gallons ) 12. Gallons 45. 2 Base Coat #298 Emulsion 6 Gallons 23. 3 Polyester Fabric 1 Ply 2.5 4 Interply Coat #298 Emulsion 6 Gallons 23. 5 Polyester Fabric (Second Ply) (in Emulsion) 1 Ply 2.5 6 Base Coat ElastaHyde 3. Gallons 21. 7 Polyester Fabric (in ElastaHyde) 1 Ply 2.5 8 Surface / Reflective Coating - ElastaHyde White Acrylic 3 Gallons 21. Total System Dry Weight 140.5 (w/fill) Total System Dry Mils (approximate) - (fill not included) 165 mils Total System Dry Mils (approximate) - (fill included) 257 mils ** weight approximate (per 100 sq. ft.) This is one coordinated roof system; a component bulletin alone does not represent the complete assembly.

Data sheets and technical documents

Current manufacturer system specifications, application guidelines and component data sheets matched to this assembly.

Current

Current files

Archive

Archived files

No older reviewed revisions are archived for this product yet.

Specified thickness and coverage

The published specification states: Total System Dry Mils (approximate) - (fill not included) 165 mils. Use the current PDF for wet application quantities, reinforcement placement, allowable substitutions and any fill-coat quantities that are excluded from the stated dry thickness.

Existing-roof assessment

Before specifying a recover or upgrade, document the existing membrane, deck, moisture condition, drainage, attachment, surface contamination and repairs. The official specification requires the substrate to be suitable for the assembly; project conditions may require manufacturer review or removal rather than coating.

Submittals and field controls

Submit the exact system code, current specification revision and matched component bulletins. During installation, record surface preparation, reinforcement, batch information, application quantities, weather, cure windows and inspection results so the installed work can be compared with the cited assembly.

Detailing and transitions

Follow the current specification and manufacturer details at drains, penetrations, curbs, seams, fasteners, terminations and substrate transitions. Verify the required elastic cement, polyester reinforcement and coating overlap; detail materials are part of the assembly rather than interchangeable accessories.

Limitations and project review

Confirm existing-roof moisture, attachment, drainage, adhesion and surface condition before choosing this specification. Check the cited document for temperature, rain, dew, cure and substrate restrictions, and obtain project-specific manufacturer review where the roof condition or required approval falls outside the published scope.

Maintenance and document history

Retain the accepted specification, closeout photographs and repair records. Future edits should add a cited history entry when Western Colloid revises, replaces or withdraws a specification; earlier documents remain identifiable in the archive rather than being erased.

Revision and citation controls

Record the exact specification code, PDF revision and technical-bulletin editions used in the project submittal. A later manufacturer upload does not overwrite that evidence: add the new file as current, archive the earlier edition and preserve the author, timestamp, source and reason for the status change.

Sources and citations

Contribution history

Published changes remain in this permanent record. Corrections create a new entry instead of deleting earlier history.

  1. September 21, 2026 at 8:48 amLibrary Record

Technical reference note

Verify current suitability, availability, engineering performance, certification, warranty, and installation requirements with the manufacturer and the project design professional before specification or construction. Archived files do not represent current requirements.