Sikalastic 702 – 701 SF Fluid-Applied Protected or Exposed Membrane Roofing-Waterproofing

From the Total Cladding and Roofing Technical Library

Log in to edit
First page of Sikalastic 702 - 701 SF Fluid-Applied Protected or Exposed Membrane Roofing-Waterproofing Specification

Sikalastic 702 – 701 SF Fluid-Applied Protected or Exposed Membrane Roofing-Waterproofing

Manufacturer
Sika
Product
Sikalastic 702 - 701 SF Fluid-Applied Protected or Exposed Membrane Roofing-Waterproofing
Status
Current
Market
United States
Latest revision
Not confirmed
Latest file date
Not confirmed
Last verified
September 20, 2026
Archived files
0

System overview

Sikalastic 702 - 701 SF Fluid-Applied Protected or Exposed Membrane Roofing-Waterproofing is represented by Sika's US guide specification for polyurea roofing and waterproofing system. The record connects the complete assembly specification to the principal membrane or coating data sheets named in that source.

  • Specification section: 07 55 56
  • System class: Polyurea roofing and waterproofing system
  • Matched technical set: one complete guide specification plus 2 principal product data sheets
  • Market control: Sika US sources only

Manufacturer-defined use

Provide a protected cold-fluid-applied polyurea hybrid roofing/waterproofing system on structural concrete, plywood sheathing, metal or other approved substrates.

Assembly and components

Treat this as a complete Sika assembly. Use the guide specification to select the membrane or coating, reinforcement, substrate primer, flashing materials, protection or overburden, and accessories. The principal product data sheets below describe individual materials but do not replace the assembly specification.

Data sheets and technical documents

Current manufacturer system specifications, application guidelines and component data sheets matched to this assembly.

Current

Current files

Archive

Archived files

No older reviewed revisions are archived for this product yet.

Substrate and existing-condition review

Confirm structural deck or existing membrane type, moisture, adhesion, drainage, contamination and movement before selection. The guide specification requires project editing; retain only substrates and options that apply, and obtain manufacturer review where the existing condition is outside the published scope.

Specification and submittals

Record the exact guide-specification title and retrieved edition, together with current product data, details, shop drawings and installer qualifications required by the edited project specification. Do not combine options retained for different assemblies without written design review.

Preparation and application controls

Coordinate cleaning, repairs, primer selection, reinforcement, wet-film or consumption checks, cure windows, temperature and weather restrictions from the current guide specification and product data sheets. Document field conditions and any approved departures.

Detailing and transitions

Use current Sika details at drains, penetrations, curbs, joints, perimeters and changes in substrate. Confirm how the liquid-applied membrane connects to adjacent air, water and roofing assemblies, and record reinforcement and termination work in closeout photographs.

Quality control and closeout

Use the edited specification to define mockups, adhesion testing, inspections, repair of defects and required manufacturer involvement. Retain batch information, application quantities, inspection records, as-built details and the accepted technical submittal.

Limitations and maintenance

Verify exposure, traffic, overburden, chemical contact, ponding, code approvals and maintenance access for the selected assembly. Inspect the finished system and its transitions periodically; use cited repair guidance and preserve the installed specification edition.

Revision and citation controls

Sika publishes editable guide specifications, so project teams must identify the exact downloaded source and project edits. When Sika replaces a source, add the new edition as current and preserve the earlier edition as superseded or archived with its author, timestamp, citation and status reason.

Sources and citations

Contribution history

Published changes remain in this permanent record. Corrections create a new entry instead of deleting earlier history.

  1. September 21, 2026 at 8:48 amLibrary Record

Technical reference note

Verify current suitability, availability, engineering performance, certification, warranty, and installation requirements with the manufacturer and the project design professional before specification or construction. Archived files do not represent current requirements.